The dynamic aspects of a production scheduling problem

C. K. Farn, A. P. Muhlemann

研究成果: 雜誌貢獻期刊論文同行評審

23 引文 斯高帕斯(Scopus)

摘要

This paper presents a single machine scheduling problem with sequence dependent changeover times. An optimizing solution procedure and various appropriate heuristics are reviewed. We then go on to consider the performance of these and other heuristics in the dynamic situation, as new jobs arrive to be processed and have to be added into the existing schedule at some time. Clearly an ideal solution would be to reschedule as each new job arrived, but as this is not generally practical from a computational viewpoint, it has to be carried out less frequently. The actual frequency of this rescheduling is clearly of importance, and some of the heuristics are more adaptable to this than others. Some results are presented which attempt to quantify this adaptability for the heuristics in question, and it is demonstrated that the best heuristic for the static problem is not necessarily the best heuristic in the dynamic situation.

原文???core.languages.en_GB???
頁(從 - 到)15-21
頁數7
期刊International Journal of Production Research
17
發行號1
DOIs
出版狀態已出版 - 1979

指紋

深入研究「The dynamic aspects of a production scheduling problem」主題。共同形成了獨特的指紋。

引用此