A novel meta-heuristic is developed for solving resource-constrained project scheduling problems (RCPSP). RCPSP deals with the activities of a project to be scheduled with the objective of the makespan minimization subject to both temporal and resource constraints. The proposed improved genetic algorithm (IGA) is based on the mechanics of natural selection and natural genetics. IGA is different from the traditional paradigm in its initialization and mutation mechanism. Initialization in IGA is conducted by using chaotic generator (Logistic, Tent, and Sinusoidal) instead of random generation. And mutation is performed by parallel mutation (PM) operator rather than point mutation. Parallel mutation consists of two mutation strategies viz. Gaussian and Cauchy. Gaussian strategy is utilized for small step mutation and Cauchy strategy for large step mutation. Patterson's test suites are carried out in order to demonstrate the efficacy of the proposed algorithm on RCPSP.

原文???core.languages.en_GB???
主出版物標題21st International Conference on Production Research
主出版物子標題Innovation in Product and Production, ICPR 2011 - Conference Proceedings
編輯Tobias Krause, Dieter Spath, Rolf Ilg
發行者Fraunhofer-Verlag
ISBN(電子)9783839602935
出版狀態已出版 - 2011
事件21st International Conference on Production Research: Innovation in Product and Production, ICPR 2011 - Stuttgart, Germany
持續時間: 31 7月 20114 8月 2011

出版系列

名字21st International Conference on Production Research: Innovation in Product and Production, ICPR 2011 - Conference Proceedings

???event.eventtypes.event.conference???

???event.eventtypes.event.conference???21st International Conference on Production Research: Innovation in Product and Production, ICPR 2011
國家/地區Germany
城市Stuttgart
期間31/07/114/08/11

指紋

深入研究「Solving resource constrained project scheduling problems with improved genetic algorithm」主題。共同形成了獨特的指紋。

引用此