@article{89c493e51c7d49b4a7f6fe7788b67c2d,
title = "Short-term work team scheduling models for effective road repair and management",
abstract = "In this study, we focus on the development of work team routing/scheduling models incorporating stochastic travel and repair times. Robust and expected optimization concepts, combined with a time-space network technique, are used to develop the models. We perform numerical tests based on operational data for Taoyuan County in Taiwan. The test results show the good performance of the models.",
keywords = "Robust and expected optimizations, Routing/scheduling, Stochastic travel and repair times, Time-space network",
author = "Tang, {Ching Hui} and Shangyao Yan and Chang, {Chia Wei}",
note = "Funding Information: This research was partially supported by a grant (NSC94-2211-E-008-023) from the National Science Council of Taiwan. We thank the Taoyuan County government for providing the test data and valuable opinions on this research.",
year = "2009",
month = jun,
doi = "10.1080/03081060903017150",
language = "???core.languages.en_GB???",
volume = "32",
pages = "289--311",
journal = "Transportation Planning and Technology",
issn = "0308-1060",
number = "3",
}