Reviewing construction schedule float management

研究成果: 雜誌貢獻回顧評介論文同行評審

3 引文 斯高帕斯(Scopus)

摘要

As the complexity in construction projects increased, simply managing the obtained float values and critical path(s) by the CPM method usually results in more difficult schedule control and, consequently, in incorrect decision making due to non-realistic float values. This study thoroughly reviewed various float types in the literature and professional project management systems, and discussed five managerial essentials and three proactive strategies on mitigating challenging float-related problems based on the perspective of managing schedules by controlling floats. With some comments and suggestions, the outcomes of this study not only improve the knowledge level on schedule management but also provide a better understanding of float management to improve the quality of schedule management.

原文???core.languages.en_GB???
期刊Open Construction and Building Technology Journal
11
DOIs
出版狀態已出版 - 1 1月 2017

指紋

深入研究「Reviewing construction schedule float management」主題。共同形成了獨特的指紋。

引用此