Research in establishment of quality control and risk management systems

Jacob Chen, Jieh Haur Chen

研究成果: 會議貢獻類型會議論文同行評審

2 引文 斯高帕斯(Scopus)

摘要

If all data, records, checklists and photographs accumulated during quality checks and labor safety inspections at construction sites are not systematically arranged, stored and tracked. The status of improvements is not confirmed and tracked in a timely manner, not only will engineering quality and construction safety be influenced but work load at construction sites will increase. In view of the above scenario, development of a quality control (QC) and risk management system is a matter of priority. The quality control and risk management system we developed focuses on streamlining time and human resources at construction sites to reduce costs, and improve the quality of construction and health and safety practices. In a plan-do-check-action (PDCA) cycle, the system passed efficiently the two procedures, check, and action, to improve the implementation capability in construction sites and competitiveness in the market.

原文???core.languages.en_GB???
頁面323-328
頁數6
出版狀態已出版 - 2011
事件28th International Symposium on Automation and Robotics in Construction, ISARC 2011 - Seoul, Korea, Republic of
持續時間: 29 6月 20112 7月 2011

???event.eventtypes.event.conference???

???event.eventtypes.event.conference???28th International Symposium on Automation and Robotics in Construction, ISARC 2011
國家/地區Korea, Republic of
城市Seoul
期間29/06/112/07/11

指紋

深入研究「Research in establishment of quality control and risk management systems」主題。共同形成了獨特的指紋。

引用此