Production scheduling and truck dispatching of ready mixed concrete

Shangyao Yan, Weishen Lai, Maonan Chen

研究成果: 雜誌貢獻期刊論文同行評審

73 引文 斯高帕斯(Scopus)

摘要

In this research, we develop an integrated model that combines ready mixed concrete (RMC) production scheduling and truck dispatching in the same framework. The model is formulated as a mixed integer network flow problem with side constraints, which is characterized as NP-hard. To solve realistic problems, we develop a solution method, which incorporates a mathematical programming solver. To evaluate the model and the solution method, numerical tests using real operating data from an RMC firm in Taiwan are performed. The test results show that the model and the solution algorithm would be useful for actual operations.

原文???core.languages.en_GB???
頁(從 - 到)164-179
頁數16
期刊Transportation Research Part E: Logistics and Transportation Review
44
發行號1
DOIs
出版狀態已出版 - 1月 2008

指紋

深入研究「Production scheduling and truck dispatching of ready mixed concrete」主題。共同形成了獨特的指紋。

引用此