Preliminary Evaluation of BIM-based Approaches for Schedule Delay Analysis

Hui Yu Chou, Jyh Bin Yang

研究成果: 雜誌貢獻會議論文同行評審

19 引文 斯高帕斯(Scopus)

摘要

The problem of schedule delay commonly occurs in construction projects. The quality of delay analysis depends on the availability of schedule-related information and delay evidence. More information used in delay analysis usually produces more accurate and fair analytical results. How to use innovative techniques to improve the quality of schedule delay analysis results have received much attention recently. As Building Information Modeling (BIM) technique has been quickly developed, using BIM and 4D simulation techniques have been proposed and implemented. Obvious benefits have been achieved especially in identifying and solving construction consequence problems in advance of construction. This study preforms an intensive literature review to discuss the problems encountered in schedule delay analysis and the possibility of using BIM as a tool in developing a BIM-based approach for schedule delay analysis. This study believes that most of the identified problems can be dealt with by BIM technique. Research results could be a fundamental of developing new approaches for resolving schedule delay disputes.

原文???core.languages.en_GB???
文章編號062048
期刊IOP Conference Series: Materials Science and Engineering
245
發行號6
DOIs
出版狀態已出版 - 4 11月 2017
事件World Multidisciplinary Civil Engineering-Architecture-Urban Planning Symposium 2017, WMCAUS 2017 - Prague, Czech Republic
持續時間: 12 6月 201716 6月 2017