Optimizing construction sequences for secant pile walls

Chien Ta Chen, Ping Fu Chen, Jieh Haur Chen

研究成果: 雜誌貢獻期刊論文同行評審

摘要

Secant pile walls are crucial in the construction of fossil-fuel power plants for water exclusion purposes. The construction time is the most critical factor that influences the entire construction project. Thus, shortening the time needed for building secant pile walls requires further investigation. Secant pile walls are not required to be constructed in any particular order; typically, site engineers assign construction crews to first build several primary bored piles, and then build secondary bored piles. However, building secant pile walls in this sequence generally requires the primary bored piles to be excessively cured and hardened. The construction of secondary bored piles in this manner thus results in construction difficulties, wasted construction time, and poor construction quality. To address this practical problem, this study adopted a genetic algorithm to investigate the optimal number of primary bored piles, the curing time, and the number of daily working hours for the construction crew. In addition, the relationship between the curing time for the primary bored piles and the construction time for the secondary bored piles was investigated by using a case study, to ensure the overall research results corresponded to practical operation. The findings of this study can facilitate the saving of construction time in the future construction of secant pile walls, enabling the whole construction project to be completed successfully and improving public welfare.

原文???core.languages.en_GB???
頁(從 - 到)12-15
頁數4
期刊Chimica Oggi/Chemistry Today
37
發行號1
出版狀態已出版 - 2019

指紋

深入研究「Optimizing construction sequences for secant pile walls」主題。共同形成了獨特的指紋。

引用此