Integrating of optimization and data mining techniques for high-speed train timetable design considering disturbances

Ting Wu Ho, Te Che Chen, Chien Cheng Chou

研究成果: 會議貢獻類型會議論文同行評審

摘要

Purpose: The Taiwan high-speed railway (THSR) system plays an important role in maintaining efficient transportation of passengers around Taiwan. However, the control mechanisms of THSR and the traditional railway systems are quite different. Drivers on THSR-trains cannot control the cars by themselves; only the control center of THSR can give the commands, which are based on the train timetables and should be followed by the drivers to operate the cars. Moreover, when a disaster occurs, the control center needs to prepare a rescheduled timetable in accordance with current situations that drivers can follow. Method: This study presents a methodology to esta lish a set of optimal operation rules which are tree-based rules for real-time train timetable control for the THSR-system. The rules can be used to determine the optimal real-time operation during disturbances. Steps of the proposed methodology involve: (i) building of train timetable optimization model, (ii) generation of optimal input-output patterns, and (iii) extraction of tree-based rules for designed scenarios using the decision-tree algorithm. Results & Discussion: The model could generate a timetable result that was as good as a real timetable. This means it has potential as a simulation analysis for predicting the effect of disruptions on the timetable without doing the real experiment with train timetables during disruptive events.

原文???core.languages.en_GB???
出版狀態已出版 - 2012
事件29th International Symposium of Automation and Robotics in Construction, ISARC 2012 - Eindhoven, Netherlands
持續時間: 26 6月 201229 6月 2012

???event.eventtypes.event.conference???

???event.eventtypes.event.conference???29th International Symposium of Automation and Robotics in Construction, ISARC 2012
國家/地區Netherlands
城市Eindhoven
期間26/06/1229/06/12

指紋

深入研究「Integrating of optimization and data mining techniques for high-speed train timetable design considering disturbances」主題。共同形成了獨特的指紋。

引用此