Handoff delay analysis in SDN-enabled mobile networks: A network calculus approach

Chun Rong Lin, Yu Jia Chen, Li Chun Wang

研究成果: 書貢獻/報告類型會議論文篇章同行評審

5 引文 斯高帕斯(Scopus)

摘要

With the great potential in flexible network provisioning adapted for various quality of service (QoS)requiremen ts, software-defined network (SDN)has been considered as one of the most promising network architectures in the next generation mobile networks. However, the rule management in SDNenabled mobile networks becomes a challenging task due to rapid topology changes caused by high user mobility. One primary issue is how to handle the continuous cachemisses in the new routing path during a handoff process. To resolve the cache missing issue and reduce its handoff delay, different prefetching approaches have been proposed. However, the preinstalled rules in current prefetching approaches will incur extra delay in the core network, which cannot be ignored. In this paper, based on network calculus theory, we develop an analytical handoff delay performance model for different prefetching approaches in SDN-enabled mobile networks. The derived delay bounds of prefetching approach in different network environments are validated by simulations. We show that the presented network-calculus-based delay analysis methodology can be an effective and interesting analytical approach for evaluating ultra low delay communications systems in 5G wireless.

原文???core.languages.en_GB???
主出版物標題2017 IEEE 86th Vehicular Technology Conference, VTC Fall 2017 - Proceedings
發行者Institute of Electrical and Electronics Engineers Inc.
頁面1-5
頁數5
ISBN(電子)9781509059355
DOIs
出版狀態已出版 - 8 2月 2018
事件86th IEEE Vehicular Technology Conference, VTC Fall 2017 - Toronto, Canada
持續時間: 24 9月 201727 9月 2017

出版系列

名字IEEE Vehicular Technology Conference
2017-September
ISSN(列印)1550-2252

???event.eventtypes.event.conference???

???event.eventtypes.event.conference???86th IEEE Vehicular Technology Conference, VTC Fall 2017
國家/地區Canada
城市Toronto
期間24/09/1727/09/17

指紋

深入研究「Handoff delay analysis in SDN-enabled mobile networks: A network calculus approach」主題。共同形成了獨特的指紋。

引用此