Grey relation analysis of causes for change orders in highway construction

Chao Hui Wu, Ting Ya Hsieh, Wen Lon Cheng, Shih Tong Lu

研究成果: 雜誌貢獻期刊論文同行評審

34 引文 斯高帕斯(Scopus)

摘要

Change orders issued during the construction of the second national highway in Taiwan have been categorized depending on whether they originate from owner, design consultant, on-site contractor unit, or external parties. A total of 34 change order causes are found for this construction project. Grey relation analysis (GRA) was used in this study, and change orders in the second national highway construction project in Taiwan are characterized by the following conclusions: (1) poorly executed design drawings, policy changes and new management requirements are not important causes of change orders; and (2) more roadways should be designed as viaducts to avoid levying more land and negotiating with landowner.

原文???core.languages.en_GB???
頁(從 - 到)509-520
頁數12
期刊Construction Management and Economics
22
發行號5
DOIs
出版狀態已出版 - 6月 2004

指紋

深入研究「Grey relation analysis of causes for change orders in highway construction」主題。共同形成了獨特的指紋。

引用此