Evaluation of delay analysis methodologies on lost productivity in construction projects

Jyh Bin Yang, Kuei Mei Huang, Chang Hung Lee

研究成果: 會議貢獻類型會議論文同行評審

6 引文 斯高帕斯(Scopus)

摘要

Schedule delays commonly appear in construction projects and result in delay claim progressively. Several studies have proposed various schedule delay analysis methodologies, however, most of the studies focused on the analysis of surface data (as-planned and as-built schedules), few of them on evaluating the effects of root causes, such as lost productivity. Loss of productivity is usually experienced by a contractor while accomplishing its works less than planned rate of production. Based on the literature review on lost productivity, this study further evaluated delay analysis methodologies, professional project management software and commercial delay analysis software to identify the capabilities of those methodologies and systems in dealing with the problem of lost productivity. Research results show that evaluated delay analysis methodologies, professional project management software and commercial delay analysis software cannot deal with the problem of lost productivity appropriately. That is, developing a comprehensive delay analysis method considering lost productivity is required.

原文???core.languages.en_GB???
頁面677-683
頁數7
出版狀態已出版 - 2010
事件27th International Symposium on Automation and Robotics in Construction, ISARC 2010 - Bratislava, Slovakia
持續時間: 25 6月 201027 6月 2010

???event.eventtypes.event.conference???

???event.eventtypes.event.conference???27th International Symposium on Automation and Robotics in Construction, ISARC 2010
國家/地區Slovakia
城市Bratislava
期間25/06/1027/06/10

指紋

深入研究「Evaluation of delay analysis methodologies on lost productivity in construction projects」主題。共同形成了獨特的指紋。

引用此