Early warning system for severe change orders

Jieh Haur Chen, S. C. Hsu

研究成果: 書貢獻/報告類型會議論文篇章同行評審

1 引文 斯高帕斯(Scopus)

摘要

Change, a major cause of litigation, is inevitable and necessary to optimize a construction project. However, using litigation as the ultimate resolution is the last alternative for construction disputes, taking a huge amount of costs and time. To provide a tool, the Early Warning System (EWS) was developed by utilizing the Case Based Reasoning (CBR) approach. EWS is built to solve potential lawsuits caused by change orders using past resolutions based on data collection of this research. It was conducted in the basis of litigation archives stored in the Supreme Courts and appellate courts in 48 states and one district of the United States. 340 out of 4818 litigation archives were accepted as complete data samples during investigation. EWS is a useful tool to cope with unpredictable and unstructured disputes produced by change orders. It not only displays warnings when ongoing projects encounter similar situations occurred in the past, but also provides information related to past cases that contain procedures of settling disputes initiated by change orders. Finally this research contributes that construction owners and contractors can utilize EWS databases as reference to prevent unnecessary expenditure by legal actions.

原文???core.languages.en_GB???
主出版物標題Computing in Civil Engineering - Proceedings of the 2005 International Conference
編輯L. Soibelman, F. Pena-Mora
頁面1913-1924
頁數12
出版狀態已出版 - 2005
事件2005 ASCE International Conference on Computing in Civil Engineering - Cancun, Mexico
持續時間: 12 7月 200515 7月 2005

出版系列

名字Proceedings of the 2005 ASCE International Conference on Computing in Civil Engineering

???event.eventtypes.event.conference???

???event.eventtypes.event.conference???2005 ASCE International Conference on Computing in Civil Engineering
國家/地區Mexico
城市Cancun
期間12/07/0515/07/05

指紋

深入研究「Early warning system for severe change orders」主題。共同形成了獨特的指紋。

引用此