Developing computer-based schedule delay analysis methods based on information flow analysis: A case study

Ming Kuan Tsai, Jyh Bin Yang, Nie Jia Yau

研究成果: 雜誌貢獻期刊論文同行評審

11 引文 斯高帕斯(Scopus)

摘要

Schedule analysts often resolve diverse schedule delay problems in construction projects based on their subjective experiences. Although various process-based and mathematical-model schedule delay analysis methods are available for effective schedule delay analysis, these methods require time-consuming manual operation. The use of computer-based schedule delay analysis methods seems to be a solution. However, schedule analysts still have difficulty developing computer-based schedule delay analysis methods. Therefore, this study applies information flow analysis to classify the necessary work to develop computer-based schedule delay analysis methods. In contrast to numerous studies that focus only on computerizing a process-based or a mathematical-model schedule delay analysis method, this study constructs a computer-based method that integrates two process-based schedule delay analysis methods simultaneously. In a tested case study, the delay liability for the project owner and contractor was classified successfully. Importantly, this study provides a useful reference for similar applications in project management.

原文???core.languages.en_GB???
頁(從 - 到)823-835
頁數13
期刊Journal of Civil Engineering and Management
19
發行號6
DOIs
出版狀態已出版 - 1 12月 2013

指紋

深入研究「Developing computer-based schedule delay analysis methods based on information flow analysis: A case study」主題。共同形成了獨特的指紋。

引用此