Delay impact analysis method for lost productivity in construction projects

Jyh Bin Yang, Kuei Mei Huang, Chang Hung Lee, Sheue Meei Chen

研究成果: 會議貢獻類型會議論文同行評審

1 引文 斯高帕斯(Scopus)

摘要

Schedule delays commonly appear in construction projects and result in delay claim progressively. Several studies have proposed various schedule delay analysis methodologies. By using the as-planned and as-built schedules, most previous studies focus on the impact calculation of identified delay events on project duration. They consider the schedule variances between the as-planned and as-built schedules, but ignore to connect delay evidence to as-built schedule. Lost productivity, one essential delay cause, is usually experienced by a contractor while accomplishing its works less than planned rate of production. In a construction project, a contractor usually suffers certain damages by lost productivity caused by the owner or the third party, but the schedule impacts from the damages are not easily evaluated. How to calculate the schedule impacts by lost productivity plays a key role for solving a delay claim with lost productivity. This study tries to propose a delay analysis method for considering the schedule impact of lost productivity. With a simplified case study, the proposed method can be used as a tool to calculate the schedule impacts of schedule delays with lost productivity.

原文???core.languages.en_GB???
頁面953-954
頁數2
出版狀態已出版 - 2011
事件28th International Symposium on Automation and Robotics in Construction, ISARC 2011 - Seoul, Korea, Republic of
持續時間: 29 6月 20112 7月 2011

???event.eventtypes.event.conference???

???event.eventtypes.event.conference???28th International Symposium on Automation and Robotics in Construction, ISARC 2011
國家/地區Korea, Republic of
城市Seoul
期間29/06/112/07/11

指紋

深入研究「Delay impact analysis method for lost productivity in construction projects」主題。共同形成了獨特的指紋。

引用此