Comparison of various delay analysis methodologies for construction projects

J. B. Yang, P. C. Yin, C. K. Kao

研究成果: 書貢獻/報告類型會議論文篇章同行評審

3 引文 斯高帕斯(Scopus)

摘要

Schedule delays frequently occur in construction projects. There are many methodologies developed and used for the analysis and measurement of construction schedule delays. The popular and comparatively accepted methodologies include the time impact method, the collapsed as-built method and the windows method. However, no one method is accepted for all project participants and suitable for all situations. This study compared five delay analysis methodologies including the as-planned expanded method, the collapsed as-built analysis method, the snapshot analysis method, the windows analysis method and the isolated delay type method. This study not only compared the features of capabilities and required documents, but also dissected analysis process and employing timing for all discussed methods.

原文???core.languages.en_GB???
主出版物標題Proceedings of the 4th International Structural Engineering and Construction Conference, ISEC-4 - Innovations in Structural Engineering and Construction
頁面1395-1401
頁數7
出版狀態已出版 - 2008
事件4th International Structural Engineering and Construction Conference, ISEC-4 - Innovations in Structural Engineering and Construction - Melbourne, VIC, Australia
持續時間: 26 9月 200728 9月 2007

出版系列

名字Proceedings of the 4th International Structural Engineering and Construction Conference, ISEC-4 - Innovations in Structural Engineering and Construction
2

???event.eventtypes.event.conference???

???event.eventtypes.event.conference???4th International Structural Engineering and Construction Conference, ISEC-4 - Innovations in Structural Engineering and Construction
國家/地區Australia
城市Melbourne, VIC
期間26/09/0728/09/07

指紋

深入研究「Comparison of various delay analysis methodologies for construction projects」主題。共同形成了獨特的指紋。

引用此