Cases study on the acceptance disputes of taiwan MRT E&M systems from the perspective of risk allocation

Ko Ming Hsu, Frank Yeh, Ting Ya Hsieh

研究成果: 書貢獻/報告類型會議論文篇章同行評審

摘要

Rail construction is an essential part of the Taiwan transportation projects. Since the mass rapid transit systems are powering by electricity, the successful installation of rail work built under the core electrical & mechanical system is also the key factor of the transit system integration. For cases discussed in this research, since the client needed to apply these contracts of civil laws after the completion yet before acceptance, two problems might be generated under such circumstances: 1) if there was any matter which could not be imputed on either party caused the failure of the contract, which party should be responsible for the result; 2) if there was any cease of operation or casualties and other damages during the verification of system stability and availability, which party should be responsible. The resolve of these problems was in fact a result of risk allocation through contracts. Due to that the risk allocation principals might vary due to the prediction and planning of different parties, based on the contractual freedom idea in Taiwan, if we wish to pursue the risk allocation, this reach point out the procedures it should be. From the case study of this research, it could be seen that one applicable idea of risk distribution, yet in the verification of individual cases, there would be concerns for different ideas due to specific abstract risk allocation ideas. There might be further research into the detailed standards for risk allocation to resolve the potential doubt.

原文???core.languages.en_GB???
主出版物標題2013 Joint Rail Conference, JRC 2013
DOIs
出版狀態已出版 - 2013
事件2013 Joint Rail Conference, JRC 2013 - Knoxville, TN, United States
持續時間: 15 4月 201318 4月 2013

出版系列

名字2013 Joint Rail Conference, JRC 2013

???event.eventtypes.event.conference???

???event.eventtypes.event.conference???2013 Joint Rail Conference, JRC 2013
國家/地區United States
城市Knoxville, TN
期間15/04/1318/04/13

指紋

深入研究「Cases study on the acceptance disputes of taiwan MRT E&M systems from the perspective of risk allocation」主題。共同形成了獨特的指紋。

引用此