Case study of delay impact analysis of lost productivity in construction projects

Kuei Mei Huang, Jyh Bin Yang, Chang Hung Lee, Ruei Yu Ku

研究成果: 會議貢獻類型會議論文同行評審

1 引文 斯高帕斯(Scopus)

摘要

Schedule delays commonly appear in construction projects and result in delay claim progressively. Several studies have proposed various schedule delay analysis methodologies; however, most of the studies focus on the analysis of surface data (as-planned and as-built schedules), few of them on evaluating the effects of root causes, such as the problem of lost productivity. Lost productivity, one essential delay cause, is usually experienced by a contractor while accomplishing its works less than planned rate of production. For analyzing the situations of schedule impacts caused by lost productivity, this study discusses a case of delay analysis with lost productivity in Laiwan. Lhrough the study case, this study has proposed an approach to calculate schedule impact from lost productivity. Lhe study results will be a basis for developing a comprehensive delay analysis method considering lost productivity.

原文???core.languages.en_GB???
頁面1149-1150
頁數2
出版狀態已出版 - 2011
事件28th International Symposium on Automation and Robotics in Construction, ISARC 2011 - Seoul, Korea, Republic of
持續時間: 29 6月 20112 7月 2011

???event.eventtypes.event.conference???

???event.eventtypes.event.conference???28th International Symposium on Automation and Robotics in Construction, ISARC 2011
國家/地區Korea, Republic of
城市Seoul
期間29/06/112/07/11

指紋

深入研究「Case study of delay impact analysis of lost productivity in construction projects」主題。共同形成了獨特的指紋。

引用此