Analysis of delay causes for pipeline projects in sewage system: Taiwan cases

Jyh Bin Yang, Pi Yun Liao

研究成果: 書貢獻/報告類型會議論文篇章同行評審

5 引文 斯高帕斯(Scopus)

摘要

In a sewage system development project, pipeline construction is the key work owing to pipeline construction shares high cost compared to other works. Furthermore, pipeline construction usually suffers unforeseen site conditions and results in tremendous delays. Identifying potential delay causes is the basis for resolving delay problems before they actually occur. As the budget of sewage systems is increased annually in Taiwan, identifying delay causes and preventing them from occurring are essential for successful sewage system construction projects. Through examining fifteen real cases and validating via a questionnaire survey, this study concluded that moving existed conduits later than planned schedule, unforeseen site conditions and delayed construction planning report approval are the top three significant causes for pipeline construction projects. Identifying the causes is valuable for reference to succeed in future similar projects.

原文???core.languages.en_GB???
主出版物標題Proceedings of Pipelines Congress 2008 - Pipeline Asset Management
主出版物子標題Maximizing Performance of Our Pipeline Infrastructure
發行者ASCE - American Society of Civil Engineers
ISBN(列印)9780784409947
DOIs
出版狀態已出版 - 2008
事件Pipelines Congress 2008 - Pipeline Asset Management: Maximizing Performance of Our Pipeline Infrastructure - Atlanta, GA, United States
持續時間: 22 7月 200828 7月 2008

出版系列

名字Proceedings of Pipelines Congress 2008 - Pipeline Asset Management: Maximizing Performance of Our Pipeline Infrastructure
321

???event.eventtypes.event.conference???

???event.eventtypes.event.conference???Pipelines Congress 2008 - Pipeline Asset Management: Maximizing Performance of Our Pipeline Infrastructure
國家/地區United States
城市Atlanta, GA
期間22/07/0828/07/08

指紋

深入研究「Analysis of delay causes for pipeline projects in sewage system: Taiwan cases」主題。共同形成了獨特的指紋。

引用此