An optimal scheduling model for ready mixed concrete supply with overtime considerations

Shangyao Yan, Weishen Lai

研究成果: 雜誌貢獻期刊論文同行評審

70 引文 斯高帕斯(Scopus)

摘要

The incorporation of overtime considerations in the production and dispatching of ready mixed concrete (RMC) is a complex real world problem. In this research, the authors develop a network flow model for an RMC carrier according to Taiwan's operation situation, that integrates RMC production scheduling and truck dispatching in the same framework, to decide on an optimal RMC supply schedule which also integrates overtime considerations. To build the model, the authors employ a time-space network technique to formulate the production of RMC and the truck fleet flows in the dimensions of time and space. The model is formulated as a mixed integer network flow problem with side constraints. To efficiently solve the problem a solution algorithm incorporating a mathematical programming solver is developed. The network flow model and the solution method are then evaluated using real operating data. The test results show that the model and the solution algorithm could be useful for actual operations.

原文???core.languages.en_GB???
頁(從 - 到)734-744
頁數11
期刊Automation in Construction
16
發行號6
DOIs
出版狀態已出版 - 9月 2007

指紋

深入研究「An optimal scheduling model for ready mixed concrete supply with overtime considerations」主題。共同形成了獨特的指紋。

引用此