An empirical study on analyzing schedule delays of construction project in Indonesia

Zetta R. Kamandang, Jyh Bin Yang, Indradi Wijatmiko

研究成果: 會議貢獻類型會議論文同行評審

1 引文 斯高帕斯(Scopus)

摘要

Schedule delay is one of the worrying problems in the construction industry. Activity delays might increase project duration, cost and sometimes cause delay claim disputes between parties in construction projects. Some methods have been developed for analyzing and measuring project schedule delays, but most of those methods contain assumptions and subjective assessments. In order to identify the useful methods for projects in Indonesia, this study implements popular schedule delay analysis methods into a real project case in Indonesia which has varied relationships among activities and high frequency of concurrent delays. In this study, collecting and analyzing actual project schedule information, identifying delay events, executing delay analysis and comparing analytical results, have been completed to examine the possibilities of using available methods to provide reasonable or even correct outcomes. This study concludes that some of the available methods are unable to deal with concurrent delay problems and some result in different outcomes to the others. Therefore, choosing suitable methods would be an issue when solving delay analysis problems in Indonesia's construction projects.

原文???core.languages.en_GB???
頁面544-551
頁數8
出版狀態已出版 - 2017
事件34th International Symposium on Automation and Robotics in Construction, ISARC 2017 - Taipei, Taiwan
持續時間: 28 6月 20171 7月 2017

???event.eventtypes.event.conference???

???event.eventtypes.event.conference???34th International Symposium on Automation and Robotics in Construction, ISARC 2017
國家/地區Taiwan
城市Taipei
期間28/06/171/07/17

指紋

深入研究「An empirical study on analyzing schedule delays of construction project in Indonesia」主題。共同形成了獨特的指紋。

引用此