Subjective benefit evaluation model for immature BIM-enabled stakeholders

Jyh Bin Yang, Hung Yu Chou

Research output: Contribution to journalArticlepeer-review

40 Scopus citations

Abstract

Building Information Modeling (BIM) implementation brings many benefits for different stakeholders, but how to evaluate the benefits is still an unsolved problem. For dealing with the problem, this study proposes an overall benefit evaluation structure for BIM implementation, and then develops a subjective benefit evaluation model for immature BIM-enabled stakeholders by evaluating project-based benefits in three evaluation stages: pre-project, in-progress and post-project evaluations. Through an empirical study of thirteen BIM implementation cases in Taiwan, this study concludes that the proposed model is appropriate to evaluate project-based benefits for a stakeholder who is not familiar with BIM implementation. The research outcomes and findings of BIM benefits evaluation can assist those in the public and private sectors who have sensed the value of BIM and want to implement BIM technology. Further research to evaluate BIM benefits in different BIM implementation levels is needed.

Original languageEnglish
Article number102908
JournalAutomation in Construction
Volume106
DOIs
StatePublished - Oct 2019

Keywords

  • Benefit evaluation
  • BIM
  • Empirical study
  • Immature BIM-enabled stakeholders

Fingerprint

Dive into the research topics of 'Subjective benefit evaluation model for immature BIM-enabled stakeholders'. Together they form a unique fingerprint.

Cite this