Scheduling utility permits for reducing pavement utilitt cuts

Y. P. Chen, C. M. Chiu, S. M. Tseng, C. C. Chou

Research output: Contribution to conferencePaperpeer-review

Abstract

As more and more utility installation and/or maintenance activities are located in highly congested urban roadways, frequent pavement utility cuts in such areas may cause more traffic disruption as well as deteriorate pavement life and quality. Utility owners normally need to obtain permits from public road authorities before commencing utility activities; however, public road authorities in Taiwan currently just issue permits without trying to coordinate and communicate with utility owners involved to schedule their utility-related activities in a more consecutive way. An information model based on the spatiotemporal objects database technique was proposed to help public road authorities identify the utility activities that might be combined together to avoid unnecessary pavement utility cuts. In the proposed model, constraints pertaining to pavement moratorium, utility clearance distance and traffic conditions were considered. The software architecture is discussed, followed by research conclusions.

Original languageEnglish
StatePublished - 2008
Event11th East Asia-Pacific Conference on Structural Engineering and Construction, EASEC-11 - Taipei, Taiwan
Duration: 19 Nov 200821 Nov 2008

Conference

Conference11th East Asia-Pacific Conference on Structural Engineering and Construction, EASEC-11
Country/TerritoryTaiwan
CityTaipei
Period19/11/0821/11/08

Keywords

  • Pavement
  • Spatiotemporal objects database
  • Temporal database
  • Utility cut
  • Utility permit

Fingerprint

Dive into the research topics of 'Scheduling utility permits for reducing pavement utilitt cuts'. Together they form a unique fingerprint.

Cite this