Preliminary Evaluation of BIM-based Approaches for Schedule Delay Analysis

Hui Yu Chou, Jyh Bin Yang

Research output: Contribution to journalConference articlepeer-review

17 Scopus citations

Abstract

The problem of schedule delay commonly occurs in construction projects. The quality of delay analysis depends on the availability of schedule-related information and delay evidence. More information used in delay analysis usually produces more accurate and fair analytical results. How to use innovative techniques to improve the quality of schedule delay analysis results have received much attention recently. As Building Information Modeling (BIM) technique has been quickly developed, using BIM and 4D simulation techniques have been proposed and implemented. Obvious benefits have been achieved especially in identifying and solving construction consequence problems in advance of construction. This study preforms an intensive literature review to discuss the problems encountered in schedule delay analysis and the possibility of using BIM as a tool in developing a BIM-based approach for schedule delay analysis. This study believes that most of the identified problems can be dealt with by BIM technique. Research results could be a fundamental of developing new approaches for resolving schedule delay disputes.

Original languageEnglish
Article number062048
JournalIOP Conference Series: Materials Science and Engineering
Volume245
Issue number6
DOIs
StatePublished - 4 Nov 2017
EventWorld Multidisciplinary Civil Engineering-Architecture-Urban Planning Symposium 2017, WMCAUS 2017 - Prague, Czech Republic
Duration: 12 Jun 201716 Jun 2017

Fingerprint

Dive into the research topics of 'Preliminary Evaluation of BIM-based Approaches for Schedule Delay Analysis'. Together they form a unique fingerprint.

Cite this