TY - JOUR
T1 - Modeling and integration of planning, scheduling, and equipment configuration in semiconductor manufacturing part I. review of sucesses and opportunities
AU - Fordyce, Ken
AU - Milne, R. John
AU - Wang, Chi Tai
AU - Zisgen, Horst
N1 - Publisher Copyright:
© 2015 International journal of industrial engineering.
PY - 2015
Y1 - 2015
N2 - Managing the supply chain of a semiconductor based package goods enterprise-including planning, scheduling, and equipment configurations-is a complicated undertaking, particularly in a manner that is responsive to changes throughout the demand supply network. Typically, management responds to the complexity and scope by partitioning responsibility that narrows the focus of most of the groups in an organization-though the myriad of decisions are tightly integrated. Improving system responsiveness is best addressed by an advanced industrial engineering (AIE) team that is typically the only group with the ability to see the forest and the trees. These teams integrate information and decision technology (analytics) into an application which improves some aspect of planning, scheduling, and equipment configuration. This paper illustrates the need for AIE teams to serve as agents of change, touches on three success stories, highlights the sporadic progress and incubation process in applying analytics to support responsiveness where forward progress by early adopters is often followed with stagnation or reversal as subsequent adopters require a natural incubation period. This paper and its companion paper (Part II. Fab Capability Assessment) identify modeling challenges and opportunities within these critical components of responsiveness: semiconductor fabrication facility/factory capability assessment, moderate length process time windows, moving beyond opportunistic scheduling, and plan repairs to modify unacceptable results. Although aspects of this paper have the feel of a review paper, this paper is different in nature-a view from the trenches which draws from the collective clinical experience of a team of agents of change within the IBM Microelectronics Division (MD) from 1978 to 2012. During much of this period MD was a fortune 100 size firm by itself with a diverse set of products and manufacturing facilities around the world. During this time frame, the team developed and institutionalized applications to support responsiveness within IBM and by IBM clients, while staying aware of what others are doing within the literature and industry. The paper provides insights from the trenches to shed light on the past but more importantly to identify opportunities for improvement and the critical role of advanced industrial engineers as agents of change to meet these challenges.
AB - Managing the supply chain of a semiconductor based package goods enterprise-including planning, scheduling, and equipment configurations-is a complicated undertaking, particularly in a manner that is responsive to changes throughout the demand supply network. Typically, management responds to the complexity and scope by partitioning responsibility that narrows the focus of most of the groups in an organization-though the myriad of decisions are tightly integrated. Improving system responsiveness is best addressed by an advanced industrial engineering (AIE) team that is typically the only group with the ability to see the forest and the trees. These teams integrate information and decision technology (analytics) into an application which improves some aspect of planning, scheduling, and equipment configuration. This paper illustrates the need for AIE teams to serve as agents of change, touches on three success stories, highlights the sporadic progress and incubation process in applying analytics to support responsiveness where forward progress by early adopters is often followed with stagnation or reversal as subsequent adopters require a natural incubation period. This paper and its companion paper (Part II. Fab Capability Assessment) identify modeling challenges and opportunities within these critical components of responsiveness: semiconductor fabrication facility/factory capability assessment, moderate length process time windows, moving beyond opportunistic scheduling, and plan repairs to modify unacceptable results. Although aspects of this paper have the feel of a review paper, this paper is different in nature-a view from the trenches which draws from the collective clinical experience of a team of agents of change within the IBM Microelectronics Division (MD) from 1978 to 2012. During much of this period MD was a fortune 100 size firm by itself with a diverse set of products and manufacturing facilities around the world. During this time frame, the team developed and institutionalized applications to support responsiveness within IBM and by IBM clients, while staying aware of what others are doing within the literature and industry. The paper provides insights from the trenches to shed light on the past but more importantly to identify opportunities for improvement and the critical role of advanced industrial engineers as agents of change to meet these challenges.
KW - Demand supply network
KW - Hierarchical production control
KW - Process time windows
KW - Semiconductor manufacturing
KW - Systems integration
KW - Tool capacity planning
UR - http://www.scopus.com/inward/record.url?scp=84964005592&partnerID=8YFLogxK
M3 - 期刊論文
AN - SCOPUS:84964005592
SN - 1072-4761
VL - 22
SP - 575
EP - 600
JO - International Journal of Industrial Engineering : Theory Applications and Practice
JF - International Journal of Industrial Engineering : Theory Applications and Practice
IS - 5
ER -