Abstract

Managing the engineering interfaces of mass rapid transit (MRT) projects is difficult and exhausting work because thousands of complex interrelated construction interfaces are embedded among multiple subworks and subsystems. When these interfaces are not revealed and thoroughly preplanned to achieve timely execution, they generate countless disputes among project parties and delay the overall progress considerably. This paper discusses a stepwise procedure to provide an empirical and comprehensive solution for managing the engineering interface of MRT projects. The proposed procedure involves four steps: (1) identification of the key interface correlation and work scope using a work-breakdown structure; (2) allocation of interface scope responsibilities and criteria using a phase approach; (3) preplanning the interface work items; and (4) setting up interface organizations using veto authorization. The proposed method is suitable for design-build or design-bid-build MRT contracts, thereby benefiting practitioners of interface management in the relevant field.

Original languageEnglish
Article number05017001
JournalJournal of Construction Engineering and Management
Volume143
Issue number6
DOIs
StatePublished - 1 Jun 2017

Keywords

  • Construction management
  • Contract management
  • Interface management
  • Mass rapid transit
  • Project planning and design

Fingerprint

Dive into the research topics of 'Managing Complex Engineering Interfaces of Urban Mass Rapid Transit Projects'. Together they form a unique fingerprint.