Comparison of windows-based delay analysis methods

Chih Kuei Kao, Jyh Bin Yang

Research output: Contribution to journalArticlepeer-review

20 Scopus citations

Abstract

Schedule delays often occur in construction projects and result a controversial issue in assessing their impact on total duration. Windows-based delay analysis methods are the most accurate among various analysis methods for identifying and measuring construction schedule delays. These methods are homologous, but are suitable for different delay situations. This study compares four windows-based delay analysis methods to identify their advantages and limitations. The differences in terms of the perspectives of use prerequisite, functional capability, analytical process and accuracy of analysis results are discussed in terms of a simulated case. Study results are helpful for delay analysts in selecting a suitable method among different windows-based delay analysis methods.

Original languageEnglish
Pages (from-to)408-418
Number of pages11
JournalInternational Journal of Project Management
Volume27
Issue number4
DOIs
StatePublished - May 2009

Keywords

  • Claims
  • Comparison study
  • Delay analysis
  • Schedule analysis

Fingerprint

Dive into the research topics of 'Comparison of windows-based delay analysis methods'. Together they form a unique fingerprint.

Cite this