Cases study on the acceptance disputes of taiwan MRT E&M systems from the perspective of risk allocation

Ko Ming Hsu, Frank Yeh, Ting Ya Hsieh

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

Abstract

Rail construction is an essential part of the Taiwan transportation projects. Since the mass rapid transit systems are powering by electricity, the successful installation of rail work built under the core electrical & mechanical system is also the key factor of the transit system integration. For cases discussed in this research, since the client needed to apply these contracts of civil laws after the completion yet before acceptance, two problems might be generated under such circumstances: 1) if there was any matter which could not be imputed on either party caused the failure of the contract, which party should be responsible for the result; 2) if there was any cease of operation or casualties and other damages during the verification of system stability and availability, which party should be responsible. The resolve of these problems was in fact a result of risk allocation through contracts. Due to that the risk allocation principals might vary due to the prediction and planning of different parties, based on the contractual freedom idea in Taiwan, if we wish to pursue the risk allocation, this reach point out the procedures it should be. From the case study of this research, it could be seen that one applicable idea of risk distribution, yet in the verification of individual cases, there would be concerns for different ideas due to specific abstract risk allocation ideas. There might be further research into the detailed standards for risk allocation to resolve the potential doubt.

Original languageEnglish
Title of host publication2013 Joint Rail Conference, JRC 2013
DOIs
StatePublished - 2013
Event2013 Joint Rail Conference, JRC 2013 - Knoxville, TN, United States
Duration: 15 Apr 201318 Apr 2013

Publication series

Name2013 Joint Rail Conference, JRC 2013

Conference

Conference2013 Joint Rail Conference, JRC 2013
Country/TerritoryUnited States
CityKnoxville, TN
Period15/04/1318/04/13

Keywords

  • Acceptance disputes
  • Legal dispute
  • Mass rapid transit
  • Risk allocation
  • Taiwan legal system

Fingerprint

Dive into the research topics of 'Cases study on the acceptance disputes of taiwan MRT E&M systems from the perspective of risk allocation'. Together they form a unique fingerprint.

Cite this