Case-based allocation of onsite supervisory manpower for construction projects

Jieh Haur Chen, Li Ren Yang, W. H. Chen, C. K. Chang

Research output: Contribution to journalArticlepeer-review

23 Scopus citations

Abstract

In the highly competitive worldwide construction industry, a slight inaccuracy of estimation can easily cause the loss of a project. Erroneous experience-based cost estimates or allocations of onsite supervisory manpower often offset the profit gained from the project and may even jeopardize the management processes. To counter these types of problems, we develop a model using mathematical analysis and case-based reasoning to automate the allocation of onsite supervisory manpower and its costs. The method is founded upon laborious data collection processes and analysis by matching statistical assumptions, and is applicable to construction projects for residential buildings, industrial office buildings, commercial buildings and industrial construction. In the modelling the costs and allocation of onsite supervisory manpower are quantified for both owners and contractors before initiating or bidding on the projects. The findings confirm that the degree of variation of the model predictions has an accuracy rate at 88.47%. Single-site construction projects with the following characteristics: a non-crashing schedule, a floor area of less than 35 000 m2, a height of less than 50m, can be accurately predicted and the assignment of supervisory manpower feasibly automated.

Original languageEnglish
Pages (from-to)805-814
Number of pages10
JournalConstruction Management and Economics
Volume26
Issue number8
DOIs
StatePublished - Aug 2008

Keywords

  • Allocation
  • Human resource management
  • Onsite
  • Overheads
  • Supervisory manpower costs