An optimization model for just-in-time (JIT) delivery of precast components considering 3D loading constraints, real-time road conditions and assembly time

Wenqi Mao, Kexin Ran, Ting Kwei Wang, Anyuan Yu, Hongyue Lv, Jieh Haur Chen

Research output: Contribution to journalArticlepeer-review

Abstract

Purpose: Although extensive research has been conducted on precast production, irregular component loading constraints have received little attention, resulting in limitations for transportation cost optimization. Traditional irregular component loading methods are based on past performance, which frequently wastes vehicle space. Additionally, real-time road conditions, precast component assembly times, and delivery vehicle waiting times due to equipment constraints at the construction site affect transportation time and overall transportation costs. Therefore, this paper aims to provide an optimization model for Just-In-Time (JIT) delivery of precast components considering 3D loading constraints, real-time road conditions and assembly time. Design/methodology/approach: In order to propose a JIT (just-in-time) delivery optimization model, the effects of the sizes of irregular precast components, the assembly time, and the loading methods are considered in the 3D loading constraint model. In addition, for JIT delivery, incorporating real-time road conditions in the transportation process is essential to mitigate delays in the delivery of precast components. The 3D precast component loading problem is solved by using a hybrid genetic algorithm which mixes the genetic algorithm and the simulated annealing algorithm. Findings: A real case study was used to validate the JIT delivery optimization model. The results indicated this study contributes to the optimization of strategies for loading irregular precast components and the reduction of transportation costs by 5.38%. Originality/value: This study establishes a JIT delivery optimization model with the aim of reducing transportation costs by considering 3D loading constraints, real-time road conditions and assembly time. The irregular precast component is simplified into 3D bounding box and loaded with three-space division heuristic packing algorithm. In addition, the hybrid algorithm mixing the genetic algorithm and the simulated annealing algorithm is to solve the 3D container loading problem, which provides both global search capability and the ability to perform local searching. The JIT delivery optimization model can provide decision-makers with a more comprehensive and economical strategy for loading and transporting irregular precast components.

Original languageEnglish
JournalEngineering, Construction and Architectural Management
DOIs
StateAccepted/In press - 2024

Keywords

  • 3D loading constraints
  • JIT delivery model
  • Precast components
  • Real-time road conditions

Fingerprint

Dive into the research topics of 'An optimization model for just-in-time (JIT) delivery of precast components considering 3D loading constraints, real-time road conditions and assembly time'. Together they form a unique fingerprint.

Cite this