Abstract
An effective maintenance manpower supply plan not only reduces operating costs but ensures greater aviation safety and punctuality. A variety of flexible management strategies have been widely applied in other industries; however, little research has stressed flexible management strategies for airline crew scheduling problems. Here, we introduce a model that includes various flexible strategies so that an airline can effectively manage its maintenance manpower supply. The model is formulated as a mixed integer program that is solved using a commercial software package, CPLEX. In order to evaluate the model performance, we use the operating data from a leading Taiwan airline.
Original language | English |
---|---|
Pages (from-to) | 233-239 |
Number of pages | 7 |
Journal | Journal of Air Transport Management |
Volume | 9 |
Issue number | 4 |
DOIs | |
State | Published - Jul 2003 |
Keywords
- Crew scheduling
- Flexible management strategy
- Maintenance manpower supply
- Mixed integer program