建構國內時程管理規範之研究

Translated title of the contribution: Developing Schedule Management Specifications for Public Construction Projects in Taiwan

Jyh Bin Yang, Wen Hsin Wei

Research output: Contribution to journalArticlepeer-review

Abstract

In recent years, construction projects still face schedule delays in Taiwan although a master specification "01103 progress management" has been promulgated for many years. Notably, the 01103 master specification was included into limited construction projects, and the regulations related to schedule management are scattered in different contract documents. For overcoming the ineffective problem of schedule management specification in Taiwan, to analyze schedule management problems systematically and then to propose an improved specification are necessary. Based on reviewing the practice of schedule management, and comprehensively exploring the problems of schedule management in available model contracts, regulations and documents, this study proposes a new schedule management specification. The proposed schedule management specification is verified by scheduling experts in Taiwan. It is anticipated that the outcome of this study is beneficial to the entity that wants to improve schedule management performance by incorporating schedule management specification.

Translated title of the contributionDeveloping Schedule Management Specifications for Public Construction Projects in Taiwan
Original languageChinese (Traditional)
Pages (from-to)585-593
Number of pages9
JournalJournal of the Chinese Institute of Civil and Hydraulic Engineering
Volume33
Issue number7
DOIs
StatePublished - Nov 2021