結合井孔電測、井壁破壞及岩石力學資料研究注產氣對井壁穩定性之影響

Project Details

Description

This study uses the subsurface geological data from wells drilled in Yunghoshan and Chinshui anticlines to estimate the in-situ stress. The in-situ stress included pore fluid pressure (Pf), vertical stress (Sv) and minimum horizontal stress (Shmin) can be estimated from sonic logs, repeat formation tests, density logs, leak-off tests and mud densities when mud loss. With these data and Anderson’s theory of faulting, maximum horizontal stress (SHmax) can be calculated furthermore.
StatusFinished
Effective start/end date1/01/1531/12/15

Keywords

  • Wellbore stability
  • Borehole failure
  • In-stress stresses
  • Downhole logging

Fingerprint

Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.