Projects per year
Search results
-
Finished
-
-
-
Centrifuge Modeling on the Deformation and Seismic Behavior of Tunnel Closing to Fault(3/3)
Hung, W.-Y. (PI)
1/08/22 → 31/07/23
Project: Research
-
-
-
Centrifuge Modeling on the Deformation and Seismic Behavior of Tunnel Closing to Fault(2/3)
Hung, W.-Y. (PI)
1/08/21 → 31/07/22
Project: Research
-
Centrifuge Modeling on the Deformation and Seismic Behavior of Tunnel Closing to Fault(1/3)
Hung, W.-Y. (PI)
1/08/20 → 31/07/21
Project: Research
-
Centrifuge Modeling and Numerical Simulation on the Deformation of Structure and Pipeline by Fault Slipping (Ii)
Hung, W.-Y. (PI)
1/01/20 → 31/12/20
Project: Research
-
Application of the Second Generation Fbg Sensor to the Physical Modeling
Hung, W.-Y. (PI)
1/11/19 → 31/10/20
Project: Research
-
International Collaborative Research for Soil Liquefaction Simulation by Centrifuge Modeling Technique(3/3)
Hung, W.-Y. (PI)
1/08/19 → 31/07/20
Project: Research
-
-
Application of Fbg Censers to the Physical Modeling
Hung, W.-Y. (PI)
1/11/18 → 31/10/19
Project: Research
-
International Collaborative Research for Soil Liquefaction Simulation by Centrifuge Modeling Technique(2/3)
Hung, W.-Y. (PI)
1/08/18 → 31/07/19
Project: Research
-
International Collaborative Research for Soil Liquefaction Simulation by Centrifuge Modeling Technique(1/3)
Hung, W.-Y. (PI)
1/08/17 → 31/07/18
Project: Research
-
土木構造物遭受液化引致側向滑移的受震反應及模擬-子計畫:基盤土壤液化引致的側潰對上方土堤的影響及其改善對策(II)
Hung, W.-Y. (PI)
1/08/16 → 31/07/17
Project: Research
-
土木構造物遭受液化引致側向滑移的受震反應及模擬-子計畫:基盤土壤液化引致的側潰對上方土堤的影響及其改善對策(I)
Hung, W.-Y. (PI)
1/08/15 → 31/07/16
Project: Research