Projects per year
Projects
- 7 Finished
Search results
-
Finished
-
Parallel Batch Processing Problem with Machine Eligibility Determination and Time Window Constraint
Sheen, G.-J. (PI)
1/08/20 → 31/07/21
Project: Research
-
A Trimming-The-State-Space Mechanism Embedded Branch-And-Bound Approach
Sheen, G.-J. (PI)
1/08/19 → 31/07/20
Project: Research
-
A Fully Polynomial Time Approximation Scheme for Parallel Machine Scheduling with Machine Availability Constraint
Sheen, G.-J. (PI)
1/08/18 → 31/07/19
Project: Research
-
Approximation Schemes for Parallel Machine Scheduling Problems
Sheen, G.-J. (PI)
1/08/17 → 31/07/18
Project: Research
-
Retailer Category Management (RCM) Versus Category Captainship (CC) under Non-symmetric Product Demands(2/2)
Sheen, G.-J. (PI)
1/08/16 → 31/07/17
Project: Research
-
Retailer Category Management (RCM) Versus Category Captainship (CC) under Non-symmetric Product Demands(1/2)
Sheen, G.-J. (PI)
1/08/15 → 31/07/16
Project: Research