Projects per year
- 250 - 300 out of 327 results
Search results
-
Finished
Seismic-Isolation Study on Bridges with Variable-Frequency Friction Pendulum Systems (I)~(III)
Lee, T.-Y. (PI)
1/08/18 → 31/07/19
Project: Research
-
Smart Water Supply Redundant System Coupling Irrigation Ponds and Groundwater
Wu, R.-S. (PI)
1/08/18 → 31/07/19
Project: Research
-
Large Eddy Simulation and Experimental Study of Free Surface Flows over Circular-Crested Weirs
Chu, C.-R. (PI)
1/08/18 → 31/07/19
Project: Research
-
-
Reassignments of Airport Luggage Loading Carousels Following Incidents
Yan, S.-Y. (PI)
1/08/18 → 31/07/19
Project: Research
-
Study on Cyclic Lateral Bearing Behavior of Pile in Cohesive Soils
Huang, J.-H. (PI)
1/08/18 → 31/07/19
Project: Research
-
Research on the Steel Slag Autoclave Powder Ratio Technology and the Stability Detection Method of Steel Slag in Taiwan(1/3)
Wang, W.-C. (PI)
1/08/18 → 31/07/19
Project: Research
-
Development of Sacrificed Sensors for Rainfall-Triggered Shallow Landslide Monitoring Iii
Chung, C.-C. (PI)
1/08/18 → 30/09/19
Project: Research
-
Development of the Techniques for the Identification of Vehicle Loads on Bridge
Wang, C.-Y. (PI)
1/08/18 → 31/10/19
Project: Research
-
Investigations of Stress Intensity Factors for Cracked Asphalt Pavement Layers in Orthotropic Steel Decks
Chang, J.-H. (PI)
1/08/18 → 31/07/19
Project: Research
-
Study of Water Resources and Its Sustainable Management over a Whole Disaster Watershed under Climate and Environment Changes (II)
Wu, R.-S. (PI)
1/08/18 → 31/07/19
Project: Research
-
International Collaborative Research for Soil Liquefaction Simulation by Centrifuge Modeling Technique(2/3)
Hung, W.-Y. (PI)
1/08/18 → 31/07/19
Project: Research
-
-
Development of Smart Models and Techniques for Managing Regional Groundwater(II)
Wu, R.-S. (PI)
1/07/18 → 30/06/19
Project: Research
-
Development of Geobingan Platform on Disaster Pre-Warning and Reaction for Local Community and Disable Groups
Chung, C.-C. (PI)
1/01/18 → 31/12/18
Project: Research
-
Optimizing On-Site Earthquake Early Warning: Copula Approach(1/2)
Wang, J. P. (PI)
1/11/17 → 31/10/18
Project: Research
-
Experimental Study of Hybrid Ventilation on the Cooling Effect of Buildings
Chu, C.-R. (PI)
1/08/17 → 31/07/18
Project: Research
-
Flight Schedule and Fleet Route Adjustments in Response to Typhoon Disturbance Events(3/3)
Yan, S.-Y. (PI)
1/08/17 → 31/07/18
Project: Research
-
The Influence of Uncertainty of Parameters on the Solutions of Engineering Optimization Models(3/3)
Yan, S.-Y. (PI)
1/08/17 → 31/07/18
Project: Research
-
Utilization of Bio-Fuel Furnace Ash in Cementitious Materials
Huang, W.-H. (PI)
1/08/17 → 31/07/18
Project: Research
-
Agricultural Field Water Management Model and Control Technique for Shangyun Region(3)
Wu, R.-S. (PI)
1/08/17 → 31/07/18
Project: Research
-
Study of Water Resources and Its Sustainable Management over a Whole Disaster Watershed under Climate and Environment Changes ( I )
Wu, R.-S. (PI)
1/08/17 → 31/07/18
Project: Research
-
Determination of Representative Elementary Volume Size Using Synthetic Rock Mass Model
Tien, Y.-M. (PI)
1/08/17 → 31/07/18
Project: Research
-
International Collaborative Research for Soil Liquefaction Simulation by Centrifuge Modeling Technique(1/3)
Hung, W.-Y. (PI)
1/08/17 → 31/07/18
Project: Research
-
Performance Improvement for Steel Structures with Y-Braced Dampers
Hsu, H.-L. (PI)
1/08/17 → 31/07/18
Project: Research
-
On the Investigation and Analysis of Slope Movements Based on High-Revolution Terrain Data
Chou, H.-T. (PI)
1/08/17 → 31/10/18
Project: Research
-
Development of Sacrificed Sensors for Rainfall-Triggered Shallow Landslide Monitoring
Chung, C.-C. (PI)
1/08/17 → 31/07/18
Project: Research
-
De-Oscillatory Displacement Jumps Method for Calculation of Stress Intensity Factors for Three-Dimensional Bimaterial Interface Cracks
Chang, J.-H. (PI)
1/08/17 → 31/07/18
Project: Research
-
A Study on Travel Demand Models and Associated Solution Algorithms(2/3)
Chen, H.-K. (PI)
1/08/17 → 31/07/18
Project: Research
-
Study on Cyclic Bearing Behavior of Pile in Sand (Ii)(2/2)
Huang, J.-H. (PI)
1/08/17 → 31/07/18
Project: Research
-
Seismic Design of New Rc Beams II – Anti-Buckle Spacing for High Strength Beam Bars
Wang, Y.-C. (PI)
1/08/17 → 31/07/18
Project: Research
-
Development of a Non-Contact Laser Scanning System for the Inspection of Geometrical Configuration of Railway Tracks
Wang, C.-Y. (PI)
1/08/17 → 31/10/18
Project: Research
-
Development of Smart Models and Techniques for Managing Regional Groundwater( I )
Wu, R.-S. (PI)
1/07/17 → 30/06/18
Project: Research
-
Pilot Study of Disaster Information Integration between Central Government and Local Government - Tao-Yuan City
Wang, C.-Y. (PI)
1/01/17 → 31/12/17
Project: Research
-
Pilot Study of Disaster Information Integration between Central Government and Local Government - Hsin-Chu County
Tien, Y.-M. (PI)
1/01/17 → 31/12/17
Project: Research
-
The Influence of Uncertainty of Parameters on the Solutions of Engineering Optimization Models(2/3)
Yan, S.-Y. (PI)
1/08/16 → 31/07/17
Project: Research
-
Study on Cyclic Bearing Behavior of Pile in Sand (Ii)(1/2)
Huang, J.-H. (PI)
1/08/16 → 31/07/17
Project: Research
-
Utilization of Big Data Analysis to Build up Pavement Life Cycle Assessment in Taiwan Freeway
Chen, S.-H. (PI)
1/08/16 → 31/07/17
Project: Research
-
The Monitoring and Flow Dynamics of Gravelly Debris Flows at Houyenshan Gullies(2/2)
Chou, H.-T. (PI)
1/08/16 → 31/10/17
Project: Research
-
A Study on the Displacement Control of an Isolated Bridge with Rocking Response of Spread Foundations
Lee, T.-Y. (PI)
1/08/16 → 31/07/17
Project: Research
-
土木構造物遭受液化引致側向滑移的受震反應及模擬-子計畫:基盤土壤液化引致的側潰對上方土堤的影響及其改善對策(II)
Hung, W.-Y. (PI)
1/08/16 → 31/07/17
Project: Research
-
Geometrical and Mechanical Representative Elementary Volume and Mechanical Properties of Fractured Rock Masses
Tien, Y.-M. (PI)
1/08/16 → 31/07/17
Project: Research
-
A Study on Travel Demand Models and Associated Solution Algorithms(1/3)
Chen, H.-K. (PI)
1/08/16 → 31/07/17
Project: Research
-
Agricultural Field Water Management Model and Control Technique for Shangyun Region(2)
Wu, R.-S. (PI)
1/08/16 → 31/07/17
Project: Research
-
Flight Schedule and Fleet Route Adjustments in Response to Typhoon Disturbance Events(2/3)
Yan, S.-Y. (PI)
1/08/16 → 31/07/17
Project: Research
-
An Unsteady Transport Model for Gaseous Pollutants in Partitioned Buildings
Chu, C.-R. (PI)
1/08/16 → 31/07/17
Project: Research