Projects per year
- 200 - 250 out of 327 results
Search results
-
Finished
A Preliminary Study on Integrating Bim and Taiwan Bridge Management System
Yau, N.-J. (PI)
1/08/20 → 31/07/21
Project: Research
-
Development and Validation of Multi Spatial-Temporal Scale Monitoring and Data Fusion for Rock Slope Early Warning
Chung, C.-C. (PI)
1/08/20 → 31/10/21
Project: Research
-
Anisotropic Engineering Behaviors of Fractured Rock Tunnel, Rock Slope and Foundation(1/3)
Tien, Y.-M. (PI)
1/08/20 → 31/07/21
Project: Research
-
Comparable Study on Four Soil Retaining Walls(2/3)
Wang, J. P. (PI)
1/08/20 → 31/07/21
Project: Research
-
Evaluation on the Potential of Ashes Derived from Industrial Boilers Co-Firing Coal and Recycled Fuels as Concrete Materials(2/2)
Huang, W.-H. (PI)
1/08/20 → 31/07/21
Project: Research
-
Development of Smart Models and Techniques for Managing Regional Groundwater( IV )
Wu, R.-S. (PI)
1/07/20 → 30/06/21
Project: Research
-
Advanced Development for Promoting Steel Compoment Production Using Ai-Endanced System( I )
Chen, J.-H. (PI)
1/06/20 → 31/05/21
Project: Research
-
Active Tuned Mass Damper with Phase Control for Structural Vibration Mitigation(1/2)
Lai, Y.-A. (PI)
1/02/20 → 31/01/21
Project: Research
-
Centrifuge Modeling and Numerical Simulation on the Deformation of Structure and Pipeline by Fault Slipping (Ii)
Hung, W.-Y. (PI)
1/01/20 → 31/12/20
Project: Research
-
Application of the Second Generation Fbg Sensor to the Physical Modeling
Hung, W.-Y. (PI)
1/11/19 → 31/10/20
Project: Research
-
Using Active and Passive Wireless Sensing Technology to Develop an Iot-Based Structural Smart Water Seepage Monitoring System(2/2)
Lin, T. H. (PI)
1/09/19 → 31/08/20
Project: Research
-
Comparable Study on Four Soil Retaining Walls(1/3)
Wang, J. P. (PI)
1/08/19 → 31/07/20
Project: Research
-
Non-Destructive Detection and Smart Health Monitoring of Petrochemical Plant Facilities
Wang, C.-Y. (PI)
1/08/19 → 31/07/20
Project: Research
-
Geological Uncertainty and Societal Risk: the Perspectives of Engineering, Environment, and Geohazards( I )(1/2)
Juang, C.-H. (PI)
1/08/19 → 31/07/20
Project: Research
-
On the Investigation and Analysis of Slope Movements Based on High-Revolution Terrain Data(Iii)
Chou, H.-T. (PI)
1/08/19 → 31/10/20
Project: Research
-
Impact Analysis of the Near-Field Cracked Region in Deep Geologic Repositories for Spent Nuclear Fuel
Chang, J.-H. (PI)
1/08/19 → 31/07/20
Project: Research
-
Research on the Steel Slag Autoclave Powder Ratio Technology and the Stability Detection Method of Steel Slag in Taiwan(2/3)
Wang, W.-C. (PI)
1/08/19 → 31/07/20
Project: Research
-
International Collaborative Research for Soil Liquefaction Simulation by Centrifuge Modeling Technique(3/3)
Hung, W.-Y. (PI)
1/08/19 → 31/07/20
Project: Research
-
Centrifuge Modelling on Liquefaction-Induced Settlement and Foundation Reaction
Huang, J.-H. (PI)
1/08/19 → 31/07/20
Project: Research
-
Seismic-Isolation Study on Bridges with Variable-Frequency Friction Pendulum Systems (Ii)~(Iii)
Lee, T.-Y. (PI)
1/08/19 → 31/07/20
Project: Research
-
Smart Water Supply Redundant System Coupling Irrigation Ponds and Groundwater
Wu, R.-S. (PI)
1/08/19 → 31/07/20
Project: Research
-
Developing Schedule Delay Analysis Methods Based on Evm/Esm/Edm Approaches(1/3)
Yang, J.-B. (PI)
1/08/19 → 31/07/20
Project: Research
-
Seismic Performance of Knee-Braced Frames with Amplified Deformation Steel Curved Dampers
Hsu, H.-L. (PI)
1/08/19 → 31/07/20
Project: Research
-
Estimating Shadow Prices of Air Pollutant Emissions by Road Transportation Modes
Chen, H.-K. (PI)
1/08/19 → 31/07/20
Project: Research
-
Digital Avatar Value-Added Application for Built Environments: Applying Deep Learning / Bim / Smart Meters / Iot for Energy Management(1/3)
Chou, C.-C. (PI)
1/08/19 → 31/07/20
Project: Research
-
-
Evaluation on the Potential of Ashes Derived from Industrial Boilers Co-Firing Coal and Recycled Fuels as Concrete Materials(1/2)
Huang, W.-H. (PI)
1/08/19 → 31/07/20
Project: Research
-
Determination of Representative Elementary Volume Size Using Synthetic Rock Mass Model (Ii, Iii)(2/2)
Tien, Y.-M. (PI)
1/08/19 → 31/07/20
Project: Research
-
Behavior of Reinforced Pervious Concrete Structures Subjected to Repeated Loading(1/2)
Wang, Y.-C. (PI)
1/08/19 → 31/07/20
Project: Research
-
Simulation of Storm Surges Flow over Cross-River Structures
Chu, C.-R. (PI)
1/08/19 → 31/07/20
Project: Research
-
The Preliminary Study of the Volumetric Property and Moisture Sensitive of Recycled Asphalt Concrete with Rap Contains Bof Slag(Ii)
Chen, S.-H. (PI)
1/08/19 → 31/12/20
Project: Research
-
Development of Smart Models and Techniques for Managing Regional Groundwater( III )
Wu, R.-S. (PI)
1/07/19 → 30/06/20
Project: Research
-
-
Optimizing On-Site Earthquake Early Warning: Copula Approach(2/2)
Wang, J. P. (PI)
1/11/18 → 31/10/19
Project: Research
-
Application of Fbg Censers to the Physical Modeling
Hung, W.-Y. (PI)
1/11/18 → 31/10/19
Project: Research
-
Using Active and Passive Wireless Sensing Technology to Develop an Iot-Based Structural Smart Water Seepage Monitoring System(1/2)
Lin, T. H. (PI)
1/09/18 → 31/08/19
Project: Research
-
Development of Sacrificed Sensors for Rainfall-Triggered Shallow Landslide Monitoring Iii
Chung, C.-C. (PI)
1/08/18 → 30/09/19
Project: Research
-
Large Eddy Simulation and Experimental Study of Free Surface Flows over Circular-Crested Weirs
Chu, C.-R. (PI)
1/08/18 → 31/07/19
Project: Research
-
Performance of Y-Braced Steel Frames Subject to Near-Fault Ground Motion
Hsu, H.-L. (PI)
1/08/18 → 31/10/19
Project: Research
-
-
Development of the Techniques for the Identification of Vehicle Loads on Bridge
Wang, C.-Y. (PI)
1/08/18 → 31/10/19
Project: Research