Projects per year
- 100 - 150 out of 327 results
Search results
-
Finished
-
-
-
-
-
-
-
Inspection and evaluation of the cement-treated base courses performance of the project of STA.4K+500m-STA.8K+200m, expressway No.82
Chen, S.-H. (PI)
1/09/22 → 30/09/24
Project: Research
-
Monitoring and Evaluation of Rubber Asphalt Concrete Pavement Performace
Chen, S.-H. (PI)
1/09/22 → 31/03/24
Project: Research
-
-
先進地震工程模擬實驗技術研究-隔減震結構與複合模擬-設備物主動隔震之基底加速度積分回饋天鉤控制律研發與試驗驗證(子計畫五)(I)
Lai, Y.-A. (PI)
1/08/22 → 31/07/23
Project: Research
-
具自適性能先進隔減震構造系統之研發與性能評估(II)~(III)-應用勁度可變式滑動隔震支承於曲線橋梁之減震研究及耐震性能評估(子計畫六)(II)
Lee, T.-Y. (PI)
1/08/22 → 31/07/23
Project: Research
-
Anisotropic Engineering Behaviors of Fractured Rock Tunnel, Rock Slope and Foundation(3/3)
Tien, Y.-M. (PI)
1/08/22 → 31/07/23
Project: Research
-
Centrifuge Modeling on the Deformation and Seismic Behavior of Tunnel Closing to Fault(3/3)
Hung, W.-Y. (PI)
1/08/22 → 31/07/23
Project: Research
-
-
新世代鋼結構耐震性能提升設計研發及驗證-具可調勁度斜撐之高性能鋼結構耐震設計研發及驗證(子計畫一)(III)
Hsu, H.-L. (PI)
1/08/22 → 31/10/23
Project: Research
-
利用智慧無人水面和水下載具即時監測及維管水庫、河流水文環境與設施狀態的技術開發-利用智慧無人水面和水下載具即時監測及維管水庫、河流水文環境與設施狀態的技術開發(I)
Wang, C.-Y. (PI)
1/08/22 → 31/07/23
Project: Research
-
-
多元尺度調查方法於道路岩坡破壞特性、監測及整治技術機制評估之研究-多重時空間尺度監測技術融合於岩石邊坡預警與整治應用之研發(子計畫七)(2/2)
Chung, C.-C. (PI)
1/08/22 → 31/07/24
Project: Research
-
-
-
-
-
降雨引致邊坡破壞及土砂運移過程之監測、調查與分析之精進研究-以神木村集水區為例-土砂運移行為之現地監測及集水區地貌特性分析(總計畫及子計畫一)(III)
Chou, H.-T. (PI)
1/08/22 → 31/12/23
Project: Research
-
新型鋼筋混凝土(NewRC)與混合結構系統之應用技術研發-新型鋼筋混凝土構材受低週次循環荷載疲勞行為研究(子計畫六)(I)
Wang, Y.-C. (PI)
1/08/22 → 31/07/23
Project: Research
-
建築物抗液化性能評估與提升對策之研究(III)(與子計畫合併)-建築物液化防治試驗與評估技術之開發-深基礎結構工法(總計畫及子計畫四)(III)
Huang, J.-H. (PI)
1/08/22 → 31/07/23
Project: Research
-
-
-
-
多元尺度調查方法於道路岩坡破壞特性、監測及整治技術機制評估之研究-以物理試驗及數值模型探討不同尺度岩坡之整治技術與破壞機制關係(子計畫四)(2/2)
Hwang, W.-C. (PI)
1/08/22 → 31/07/23
Project: Research
-
-
台南及高雄地區穩定供水與減災總合策略研究與成效評估-推估各季節區域農業水資源需求與農業涵養地下水資源之研究(子計畫三)(1/2)
Wu, R.-S. (PI)
1/08/22 → 31/07/23
Project: Research
-
Application of Integrating Smart Sensing Tags and Smart Robots with Robotic Arm Functions in the Structural Inspection of Box Girder(3/3)
Lin, T. H. (PI)
1/08/22 → 31/07/23
Project: Research
-
-
The 26th Symposium on Construction Engineering and Management
Wang, H.-H. (PI)
15/06/22 → 22/07/22
Project: Research
-
The 26th Symposium on Construction Engineering and Management
Wang, H.-H. (PI)
19/05/22 → 22/07/22
Project: Research
-
The 26th Symposium on Construction Engineering and Management
Wang, H.-H. (PI)
28/04/22 → 22/07/22
Project: Research
-
-
-
Sustainable Fuxing – Building Smart and Resilient Tribes
Chung, C.-C. (PI)
1/01/22 → 31/12/22
Project: Research
-
-
-
-
-
Ministry of Education Yushan Scholar Program Application
Juang, C.-H. (PI)
28/11/21 → 31/03/23
Project: Research
-
-
Research on Advanced Earthquake Engineering Hybrid Simulation Technology - Vibration Isolation and Reduction of Structure and Hybrid Simulation - Seismic Design and Composite Experiment Technology of Metal-containing Seismic Device Frames (Main Project and Sub-Project 1) (I)
Lai, Y.-A. (PI)
1/11/21 → 31/07/22
Project: Research
-
具自適性能先進隔減震構造系統之研發與性能評估-應用勁度可變式滑動隔震支承於曲線橋梁之減震研究及耐震性能評估(子計畫六)(I)
Lee, T.-Y. (PI)
1/08/21 → 31/07/22
Project: Research
-
多元尺度調查方法於道路岩坡破壞特性、監測及整治技術機制評估之研究-多重時空間尺度監測技術融合於岩石邊坡預警與整治應用之研發(子計畫七)(1/2)
Chung, C.-C. (PI)
1/08/21 → 31/07/23
Project: Research
-